Feedback is the backlog
User needs, bug reports and improvement proposals are collected in the same work context. People assess priority and scope.
/ platform
SWAPP is developed as the operations workspace of the UMAY ecosystem. Its modules connect data and work context; the planned integration with UMAY OS carries that context into sourced investigations and durable engineering knowledge.
01 / Working together
SWAPP is the operations workspace. UMAY OS is the umbrella for investigations, specialist agents and durable knowledge.
Find data with Explorer. Read the context with Trend and Vitals. Connect investigation steps through Event and Plan.
In the target architecture, Core coordinates permitted interactions with SWAPP and specialist tasks. Local models, tools and knowledge sources connect through versioned contracts.
Server-side authorization
Local models and tools
Single execution owner
Scientist is designed to examine permitted data with calculation tools, compare alternative hypotheses and expose missing evidence. A sourced advisory is presented for human review.
Versioned calculations
Alternative hypotheses
Sourced advisory packet
A specialist evaluates evidence and uncertainty, then accepts, corrects or rejects the advisory. An investigation becomes durable knowledge through human review and verification.
Review the advisory
Record the decision and rationale
Verify the outcome
Target architecture · Integration and acceptance work is ongoing.
Explore UMAY OSUser needs, bug reports and improvement proposals are collected in the same work context. People assess priority and scope.
AI-assisted development follows explicit requirements and repository rules. Changes are reviewed and versioned after the relevant checks are completed.
Specs, per-module changelogs and machine-readable manifests are written with the code, not after it. The system explains itself to the next agent — and to the next engineer.
↶ every documented change makes the next one faster
Source, change and validation records stay together. Finding a proposal useful does not verify an engineering conclusion. Integration, local acceptance and institutional acceptance are separate stages.