Platform
Plan
Make the next step visible.
The problem
The modelling and machine-learning roadmap lived in scattered spreadsheets and slides, so nobody could see what was running, what came next, or who owned it.
The solution
One timeline over the whole fleet, with tasks anyone can add, move, re-own or drop.
From the interface
WPP-A
HPP-2
SPP-1
CCGT-1
Representative view; data and site names are examples.
REPRESENTATIVE INTERFACE · SYNTHETIC DATA
This mockup illustrates the product workflow; it is not connected to a live system.
How it works
- Place tasks on a shared timeline with type, owner and date range.
- Edit tasks directly by moving, resizing or reassigning them.
- Customize task types and the owner list.
- Connect each site’s modelling work with its subsequent analysis in an annual baseline.
Capabilities
- Gantt timeline
- Add, move and assign tasks
- Editable task types
- Owner list
- Annual baseline